|
Crystone Stone Paint Application Conditions · Stone paint spray gun required · Environment condition required: 5℃-40℃, <85% Relative Humility · Not to be applied in extreme weather · Base render façade must be firm, clean and level · Water content less than 10% · PH value less than 10% · High quality putty is recommended · Storage: Sealed in cool and dry place with temperature 5℃~35℃. Shelf time: 12 Months · No dilution needed · Recommended not to mix different paint batches for large areas |
Stone Paint Application Procedures 1. Prepare substrate with putty if necessary · Base is recommended to be solid, smooth, dry and clean 2. Apply primer coat · Application dosage needed: 0.1~0.2kg/㎡ (achieved by brushing over for 1~2 times) · Tool required: Wool Brush/roller /sprayer · Recoating time: no less than 1 hour · Dry to touch time: 1 hours; Dry hard time: 12 hours (under environment temperature 25℃) · Primer coat helps to seal the substrate and keep it alkali resistant and penetration resistant 3. Apply Crystone stone paint · Dosage needed: 3.5-5.0kg/㎡ with 2mm thickness (achieved by spraying over for 2~3 times) · Tool required: Stone paint sprayer · Recoating time: no less than 24 hours · Dry to touch time: 2 hours; Dry hard time: 48 hours (under environment temperature 25℃) · Spraying distance to wall is recommended to be 50-80cm 4. Apply top coat · Dosage needed: 0.15-0.3kg/㎡ (achieved by brushing over for 1~2 times) · Tool required: Wool Brush/roller/sprayer · Recoating time: no less than 1 hour · Dry to touch time: 1 hours; Dry hard time: 24 hours (under environment temperature 25℃) · Polish the sharp sands or angles on stone paint layer before spraying the top coat if necessary · Top coat helps to keep Crystone stone paint waterproof, weather-resistant and dustproof
Crystone Stone Paint Application Video
|